Custom luxury hotel suite furniture by Hivke
Hotel FF&E Manufacturer · Since 15+ Years

Custom Hotel Furniture Built to Brand Standard

Guestroom, joinery and public-area FF&E for 4–5 star hotels, villas and serviced apartments.

Hotel guestroom bedroom furniture set
Guestroom Casegoods

Quiet Luxury, Room After Room

Consistent finish and fit across hundreds of keys, verified by a mock-up room first.

Hotel lobby and public area furniture
Lobby & Public Areas

Statement Spaces, Engineered to Last

Lounge seating, reception joinery and wall panels for high-traffic hospitality.

Supplying hospitality projects across

  • USUnited States
  • UKUnited Kingdom
  • AEUAE
  • SASaudi Arabia
  • QAQatar
  • AUAustralia
  • MVMaldives
  • SGSingapore
  • CACanada
15+Years in hotel furniture manufacturing
38,690 m²Total production floor space
249Staff incl. drafting, QC & project teams
80Assessed material & component suppliers
Signature Collection

Contemporary Hospitality Series

Quiet-luxury pieces developed for resort, boutique and serviced-residence projects — every design can be resized, re-finished or re-engineered to your specification.

Zen-modern master bedroom suite
Guestroom Suite

Zen-Modern Master Bedroom Suite – Red Gradient Series

Upholstered headboard wall with matched nightstands and bench.

View Details
Minimalist oriental lounge set
Lounge

Minimalist Oriental Lounge Set – Handcrafted Wood & Textile

Solid-wood frames with commercial-grade upholstery.

View Details
Floating bed system with integrated lighting
Guestroom Suite

Floating Bed System with Integrated LED Lighting

Recessed plinth, concealed wiring and easy-clean underside.

View Details
Hospitality daybed and sculptural tea table
Lounge

Hospitality Daybed & Sculptural Tea Table Set

Window-bay daybed paired with a sculpted solid-wood table.

View Details
Executive hotel desk and media console in dark ash
Workspace

Executive Hotel Desk & Media Console – Dark Ash

Cable management, power outlets and TV integration.

View Details
Serviced apartment modular living suite
Serviced Apartment

Modular Living Suite for Serviced Apartments

Multi-functional storage optimized for long-stay layouts.

View Details
Resort twin bed configuration
Resort

Resort Twin Bed Configuration in Natural Timber

Shared headboard panel with integrated reading lights.

View Details
Designer accent armchair and illuminated shelving
Lounge

Designer Accent Armchair & Illuminated Shelving

Back-lit display shelving with a matching reading chair.

View Details
Foshan Hivke hotel furniture production facility
Onsite verified by SGS
15+Years of Experience
Manufacturing Excellence

A Custom Manufacturer, Not a Catalogue Reseller

Foshan Hivke Hotel Furniture Co., Ltd. is based in Lecong, Foshan — China's largest furniture manufacturing cluster. Our in-house engineering team converts interior designers' concepts into production-ready shop drawings, so owners, procurement agents and FF&E consultants can approve exact dimensions, joints and finishes before a single panel is cut.

We support sample-based, design-based and full customization as well as ODM development, and we regularly build to international hotel-brand FF&E guidelines for new-build and renovation projects.

Production floor space
38,690 m² (third-party verified)
Total staff
249 employees
Customization scope
Sample-based · Design-based · Full custom · ODM
Typical production lead time
30–45 days after mock-up approval
Supply chain
80 cooperating suppliers under formal assessment procedures
Design-to-Delivery Workflow

How a Hotel FF&E Package Moves Through Our Factory

A transparent, milestone-based process that keeps designers, owners and contractors aligned from drawing approval to site installation.

Shop Drawings

Engineers translate design intent into detailed drawings with dimensions, joinery and hardware schedules.

1–2 weeks

Material Samples

Veneer, lacquer, stone, metal and fabric samples submitted for designer sign-off.

1 week

Mock-up Room

A full prototype room is built and inspected to lock in quality before mass production.

3–4 weeks

Mass Production

CNC machining, veneering, finishing and upholstery with in-process QC at each station.

30–45 days

Pre-Shipment Inspection

Final inspection with photo/video reports; third-party inspectors welcome.

2–3 days

Export Packaging

Room-by-room labelling and export-grade cartons or crates to cut on-site sorting time.

Per container

Global Logistics

FOB, CIF or DDP shipping coordinated with your freight forwarder or ours.

Port to site

Installation Support

Installation manuals, remote guidance and on-site supervision for large projects.

On request
Quality & Compliance

Verified Capability, Specified Compliance

Independent verification of our facility plus material and safety standards that can be specified for your destination market.

SGSSGS Onsite AuditFactory verified by SGS Group
ISOISO 9001Quality management system
FSC® TimberCertified wood on request
E1E1 / CARB P2Low-emission board materials
Fire RetardantBS 5852 / CAL TB117 fabrics & foam
CECE ComponentsElectrical parts for EU markets

Review our independently verified data in the capability assessment report.

Buyer FAQ

What Hotel Procurement Teams Ask Us Most

Straight answers for owners, purchasing agents and FF&E consultants evaluating a new manufacturing partner.

More FAQs
Can you manufacture hotel furniture to a brand's FF&E specification?

Yes. We work from the designer's drawings and the brand's FF&E specification, prepare detailed shop drawings for approval, and build a mock-up room or prototype before mass production.

What does a typical hotel furniture project timeline look like?

Shop drawings and material samples usually take 1–3 weeks, prototype or mock-up 3–4 weeks, and mass production about 30–45 days depending on room count and finish complexity.

Which materials and finishes do you use?

Typical builds combine E1-grade plywood or MDF with natural wood veneer, solid wood, stone, metal and commercial-grade upholstery. Fire-retardant fabrics and foams can be specified to the destination market's standard.

Has your factory been independently verified?

Yes. Our facility has passed an onsite assessment by SGS Group, covering staff count, floor space, production processes and supplier assessment procedures.

Do you supply both renovation and new-build projects?

Both. For renovations we can measure from as-built drawings and phase deliveries floor by floor to keep rooms in service.

Project Consultation

Talk Directly to Our Project Engineers

Share your drawings or FF&E schedule and a dedicated project manager will review materials, construction details and delivery planning with you.

  • Factory & Office

    No. 9, East Village Section, Guangzhan Rd., Lecong Town, Foshan, Guangdong, China

  • Business Hours

    Mon – Sat, 9:00 – 18:30 (GMT+8)

  • Factory Visits

    Onsite and live video factory tours available by appointment

Prepare Your Project Brief

Including these details lets our engineers give you an accurate technical response in the first round.

  • Project type, star rating and number of keys
  • Design drawings, FF&E schedule or reference images
  • Preferred materials, finishes and fire-safety standard
  • Target delivery date and destination port
  • Whether a mock-up room or installation support is required
Contact Our Project Team

Planning a Hotel Opening or Renovation?

See how other owners and designers have worked with us on guestroom, lobby and restaurant packages.